site engineers
Record the engineering contractor and project phase associated with the role.
Industry verification planning
Use project-based intake for transmission, installation and power-network construction teams.
Start with the actual job
Multi-site projects often involve contractors and record-holding employers outside the current work location.
Record the engineering contractor and project phase associated with the role.
Separate installation subcontracting from employment with the asset owner.
Confirm supervisory tenure across handover or commissioning phases.
Record the contractor, project site, technical credential and relevant employment period separately.
These are planning examples, not client case studies, mandatory check lists or a guarantee of hiring suitability.
Purpose before package
These are starting points for agreeing a scope, not a blanket package for every person in this sector. Confirm duties, consent, source access and the employer's requirements first.
Match the candidate's identity to the records being checked. Explain name changes or spelling differences before approaching sources.
Prepare contractor names, project dates and any transfer between construction and operations employers; redact sensitive network drawings.
Match a claimed technical qualification to the issuing institution, with certification or site authorisation treated separately.
Court, police, database and other checks are not automatic additions. Agree their purpose, permitted sources and limitations separately. A name-only match is not a confirmed adverse finding. Review available services.
Prepare records, not excess data
Prepare contractor names, project dates and any transfer between construction and operations employers; redact sensitive network drawings.
Match a claimed technical qualification to the issuing institution, with certification or site authorisation treated separately.
Collect candidate documents only through the agreed secure intake. The public enquiry below is for business scope, not identity documents, employee records or account credentials.
Read the document preparation guideResolve ambiguity before a finding
Identify whether the legal employer changed at handover. Capture separate employment periods if it did; otherwise record the assignment and responsibility change within the existing tenure.
Request clarification, identify any agreed alternative source and distinguish an unavailable response from a confirmed discrepancy. The report should state which claim was checked, what the source returned and what remains unresolved. The employer makes its own policy decision.
Share candidate numbers, hiring roles, locations and the employers or qualifications per candidate. The quote and expected window depend on that scope, record completeness, source response and any field method. This guide does not publish a fixed price or guaranteed deadline.
Agree a practical scope
Share the roles and hiring locations. We will confirm the proposed checks, evidence requirements, exclusions and next steps.
No candidate documents are needed in this enquiry. Include only business requirements, not another person's sensitive records.